Got your keys in 2026? When your Dubai defects period ends

Got the keys to a new Dubai home in 2026? Work out when your one-year defects period ends, what to check and when to book an inspection.

6 min readUpdated Prepared by OMEGA CFM

Illustration

How big is Dubai's 2026 to 2027 handover wave?

Cushman & Wakefield Core reported in August 2026 that more than 23,600 homes were handed over in Dubai in the first half of the year, with about 32,000 more expected in the second half. That would make roughly 55,600 for 2026, the highest annual total since 2008. In its H1 2026 report it also projected more than 60,000 units for 2027.

Cavendish Maxwell counted 24,800 new homes added to Dubai's stock in the first half of 2026: about 18,900 apartments and 5,900 villas and townhouses. It lists 47,000 units scheduled for the second half but, based on how much scheduled supply has actually been delivered in the past, expects 14,000 to 23,500 of them to be completed.

Scheduled is not the same as delivered

The two firms use different methods, so their totals differ. Both make the same point: planned completions slip. Cushman & Wakefield Core found that only about 186,000 of the nearly 525,000 units scheduled up to 2030 had passed 20 per cent construction progress.

For you, the market forecast matters less than your own dates. Your one-year period starts on the day your unit is actually handed over, not on the date in the original brochure, so take the date from your handover documents.

One-year installations period: example dates for 2026 handovers
Keys handed overOne year ends (about)Suggested inspection window
15 January 202615 January 2027Mid-November to mid-December 2026
1 April 20261 April 2027February 2027
30 June 202630 June 2027Late April to late May 2027
1 October 20261 October 2027August 2027
15 December 202615 December 2027Mid-October to mid-November 2027
One-year installations period: example dates for 2026 handovers

When does your defects period end?

Article 40 of Law No. 6 of 2019 sets two periods for jointly owned property, which includes apartments and townhouses or houses that form part of a jointly owned community.

  • Installations, such as mechanical, electrical, sanitary and sewerage works: one year from the date the unit is handed over to you.
  • If you refrain from taking possession: the one-year period runs from the project's completion certificate instead.
  • Structural parts: ten years from the project's completion certificate, which may be earlier than your own handover.
  • Your sale and purchase agreement may give more. An agreement made after the law came into force that contradicts Article 40 is void.

Which dates to find in your paperwork

Four documents tell you where you stand. Put the one-year end date in your calendar with a reminder about three months before it; that leaves time to inspect, submit a list and chase replies.

  • Your handover date, from the handover certificate or key receipt.
  • The project's completion certificate date; ask the developer if it is not in your pack.
  • Any warranty terms in the sale and purchase agreement or handover pack.
  • The dates and reference numbers of every snag list you submitted, and the developer's replies.

What to check before the first year ends

Many installation faults only show after months of use, especially through a Dubai summer. Check the systems you rely on every day.

  • AC: cooling in every room, noise, and water leaks or staining around indoor units.
  • Water: heater performance, water pressure, slow drains, and leaks under sinks or around toilets.
  • Electrical: tripping circuits, loose or warm sockets and faulty light fittings.
  • Wet areas and openings: cracked sealant, failed grout, and leaks at windows and balcony doors after rain.
  • Open items: anything from your handover snag list that has not been fixed or has come back.

Reporting before the deadline

Send the findings in writing through the developer's stated channel, with located photographs, and keep the reference number. Do not wait until the last week: an inspection does not extend a legal deadline. If items stay open, check the dispute clause in your sale and purchase agreement and take legal advice. Dubai Land Department's real estate violation complaint service does not handle contractual disputes or refund requests.

Questions, answered.

When does the defects liability period start in Dubai?

For installations, it starts on the date your unit is handed over to you. For structural defects, it starts on the date the project obtained its completion certificate. If you refrain from taking possession, the installations period also runs from the completion certificate.

How many homes are being handed over in Dubai in 2026?

Cushman & Wakefield Core expects about 55,600 homes in 2026, the most in a year since 2008, after more than 23,600 in the first half. Cavendish Maxwell counted 24,800 new homes in the first half of 2026. Forecasts differ by method, and scheduled completions often slip.

What is an 11th-month inspection?

It is the common name for an inspection near the end of the first year after handover. It records the condition of installations and finishes while the developer's one-year liability for installations still applies, so faults can be reported in time.

My handover was delayed. Does that change my defects period?

The one-year installations period runs from the date the unit is actually handed over to you, so a later handover means a later end date. The ten-year structural period runs from the completion certificate whatever your handover date. If you refrain from taking possession, the one-year period runs from the completion certificate.

Does the defects period apply to villas and townhouses?

Law No. 6 of 2019 defines a unit to include a townhouse or independent house that forms part of jointly owned property, so many community villas and townhouses are covered. For a standalone villa outside a jointly owned scheme, check your contracts and warranties with an adviser.

Do I need to inspect if nothing seems wrong?

It is your choice. Some faults, such as hidden leaks, failing sealant or weak cooling in one room, are easy to miss in daily life. A dated record made before the year ends shows the condition while the developer is still responsible for installations.

Facts checked against

This guide is general information, not legal advice.